Valves, Instrumentation and Automation - Project Experience

SCECO PP9, PP8, PP7 - Gas Conversion
We supplied all the main block and drain valves to the mainline strainers. In addition, we supplied the emergency shutdown valves and accessories, all assembled locally, as well as the panel mounted valves, tube and valves.

Royal Commission - The 3 Stage Filtration Skids
The range of instrumentation and valve requirements on this skids was entirely sourced by SESCO. The client was quick to see the benefits to single source all the major components such as level, pressure, and differential instruments as well as the main isolation and safety relief valves.

National Gas Distribution Company - Riyadh
As more customers turn to gas we became involved with a local skid builder who supplied system for the N.G.D.C. This project became the first gas network to supply Riyadh's industrial end-users. SESCO provided the sourcing for major isolation valves for 27 skids.


Other Major Projects

Project
Product Range
year
ABHA BULK PLANTS INSTRUMENTATIONS
2002
HAWIAYH PIPELINES FITTINGS AND TUBINGS
2003
HAWIAYH  PRESSURE REDUCING CABINETS
2003
HAWIAYH AND HARADH GAS SEPARATORS
2003
SHEDGUM & UTHMANIYAH VALVES AND FITTINGS
2003
SHEDGUM DE BOTTLE NECKING FITTINGS AND TUBINGS
2002
SSSP STORAGE FACILITIES INSTRUMENTATION/PIPELINE STRAINERS
2002
GHAZLAN POWER PLANT FITTINGS
2002
SHEDGUM FIRE WATER VALVES
2001
STYRENE PLANT VALVES AND FITTINGS
2003
ROYAL COMMISSION PUMP ISOLATION VAVLES
2003
MADINA - BULU PLAMT VALVES BUTTERFLY
2004
ARAMCO HARADH BALL VALVES
2001
EXPANSION PROJECT PLUG VALVES
2002
KING KHALID PALACE PLC'S
2003
HARADH PIPELINE MANIFOLD VALVES
2002
BABCO INSTRUMENT FITTINGS & TUBINGS
2005
CUSTODY METERING RASTANURA PLC'S
CRISTAL EXPANSION VALVES, FITTINGS AND TUBINGS
2004
ARAMCO BERRI PIPING VALVES
2003
MAINTENANCE GENERAL VALVES
2000-2006
Aramco NGL Yanbu - Gas Detection System Project  GE Fanuc PLC 90-30 Redundant System
2003
Madinah Bulk Plant  Fabricated Basket Strainers 
2004
Tabuk Power Plant Expansion Project Field Instrumentation
2004
Yanpet II Debottlenecking Project Bulk Instrumentation - Tubing, Fittings & Valves
2004
Rabigh Refinery  Miscellaneous Instrumentation 
2004
PP-3 Expansion Project - Demineralization Plant  GE Fanuc PLC 90-70 Redundant System
2004
ALBA Line 5 Expansion Project - Bahrain Valves & Bulk Instrumentation
2004
Riyadh Refinery  Strainers 
2004
Bulk Plants - Site 3 (Buraydah) & Site 7 (Madinah) Strainers  & Field Instrumentation
2005
Various Aramco GOSP's Bulk & Field Instrumentation Materials
2005
Aramco Rastanura - Chemical Storage Tank Level Monitoring System .  Design & Supply Of Alarm Control Cabinet
2005
PP - 9 Riyadh Expansion Project  Motor Operated & Manuall Pipeline API 6D Ball Valves 
2005
Rabigh Refinery BOOT Desalination Plant Bulk Instrumentation Materials 
2005
Sequence Event Recorder GE Fanuc PAC System Rx-7i
2005
Telemetry System  GE Fanuc 90-30 PLC ,Versamax I/O's and Data Linc Modems
2005
Aramco Various Bulk Plants  Strainers 
2005
Riyadh Ministry Of Water - RO Plant  GE Fanuc Rx-7i Redundant System
2005
Qurrayah Power Plant Air Distribution Cabinet
2005
Khursaniyah Gas Plant - RO Plant Facilities Exotic Alloy Ball Valves
2006
Khursaniyah Gas Plant - RO Plant Facilities PLC Supply And HMI Software Development 
2006
PP - 9 Riyadh Expansion Project , Phase C & D  Thermal Relief Valves
2006
Shaoiba Power Plant Stage II Phase II Bulk Instrumentation - Tubing, Fittings & Valves
2006
Rabigh Refinery Control System Upgrade Bulk Instrumentation - Tubing, Fittings & Valves
2006
Sea Water Desalination Plant & Fresh Water Tank - Khafji  Hook Up Instrumentation Materials - 316SS & Monel 
2006
Sea Water Desalination Plant & Fresh Water Tank - Khafji  Motor & Gear Operated Butterfly And Gate Valves 12" - 36"
2006
Aramco - Khursaniyah Gas Plant Shelter Monitoring System GE Fanuc PLCs With Quick Panels 
2006
Al Amr Gold Mines Project Knife Gate Valves
2006
FCCU Scrubber Unit Project Magnetic Level Gauges
2006
Rabigh Development Project Bulk Instrumentation
2006
Abqaiq Pump Station  Strainers 
2006
Cristal Expansion Project CEP - II Knife Gate Valves
2006
Cristal Expansion Project CEP - II Bulk Instrumentation Materials - 316SS & Monel
2006
JCP Port Distribution & Export Facilities Vaccum Relief Valves 
2006
Brownfield Project - Jubail Bulk Instrumentation - Tubing, Fittings & Valves
2006
Sipchem - Jubail Actetyl Complex  Magnetic Level Gauges
2006
PDH Project - Al Fasel Yanbu  Bulk Instrumentation - Tubing, Fittings & Valves
2006
Turnaround 2006 Overhaul Steam Turbine T&T Valves
2006
Turnaround 2007 Overhaul Steam Turbine T&T Valves
2006
DHT Complex Project - Yanbu Refinery Bulk Instrumentation
2006
JUPC - Utilities & EG Plant Project Bulk Instrumentation - Tubing, Fittings & Valves
2004 / 2005
Sadaf - Furnace Fuel Mixture Valves Replacement Project  Four Way Non-Lubricated Plug Valves
2004 / 2006